As part of the Makro Shopping Mall demolition project, a controlled demolition process was planned, considering the existing building structure and surrounding developments. Occupational safety and environmental protection were prioritized throughout the operations.
Preparation Process
Before demolition began, the existing structure and work area were assessed, and the necessary site preparations were carried out. The demolition site was organized to support safe and efficient operation of construction machinery.
Demolition Operations
With our extensive machinery fleet and experienced team, the reinforced concrete sections of the shopping mall were demolished in a controlled manner using excavators. The removal of walls, columns, and floor sections was carried out through coordinated operations. Dust control and the protection of surrounding structures remained key priorities throughout the demolition process.
Project Progress
Concrete debris, steel reinforcement, and other demolition materials generated during the works were managed within the site. Demolition and debris handling operations continued in accordance with our systematic work organization and commitment to professional service.